APM Infratech is proud to be associated with L&T STEC JV Mumbai for one of the nation’s most ambitious urban mobility projects. The assignment demanded engineering precision, seamless coordination, and dependable execution across multiple structural activities. With extensive experience in metro infrastructure, APM Infratech delivered high-quality workmanship that strengthened the progress of the Mumbai Metro development.
Since 2018, APM Infratech has been continuously contributing to the project’s ongoing structural requirements. This long-term involvement reflects the client’s trust in the company’s reliability, expertise, and ability to deliver consistently across evolving site demands. Whether it involved fabrication, erection, or specialized handling tasks, APM Infratech maintained a strong emphasis on safety, accuracy, and timely delivery throughout the project span.
With a project value of ₹80 lakhs, APM Infratech executed a wide range of high-precision structural works while ensuring maximum value for the client. Each activity—from material handling to fabrication and erection—was performed with stringent quality control. The company’s capability to manage large-scale operations, heavy structural components, and multi-stage processing reinforced its position as a dependable engineering partner for major infrastructure ventures.
APM Infratech successfully undertook extensive tasks essential to the smooth functioning of the Mumbai Metro construction workflow. These included:
Through meticulous planning, skilled execution, and unwavering dedication, APM Infratech delivered performance that strengthened project progress and showcased its capability to handle complex, high-value metro infrastructure requirements.
PGCIL Meerut Substation & Siyana Repeater Station
APM Infratech is privileged to support Power Grid Corporation of India Limited—one of the nation’s most trusted power transmission authorities—in ensuring the safety and smooth functioning of critical electrical infrastructure. The project involves safeguarding high-value assets and operational zones at both the Meerut Substation and the Siyana Repeater Station. Through disciplined management and reliable manpower deployment, APM Infratech continues to deliver dependable security solutions that uphold PGCIL’s standards of operational excellence.
Since 2019, APM Infratech has been consistently providing professional security services across both project locations. This long-term engagement highlights the company’s dependability and its ability to maintain a strong, uninterrupted presence where safety is paramount. Round-the-clock coverage, trained personnel, and systematic monitoring practices have strengthened the secure environment required for seamless power grid operations.
With a project value of ₹226 lakh, APM Infratech has delivered robust, well-coordinated security management that matches the needs of critical power installations. The company ensures that every guard deployed is well-trained, vigilant, and prepared to handle the heightened responsibility associated with high-risk utility sites. This investment in quality manpower reflects APM Infratech’s dedication to delivering tangible value and reinforcing infrastructure resilience.
APM Infratech’s scope includes comprehensive security coverage through the deployment of both armed and unarmed guards across the Meerut Substation and Siyana Repeater Station. The company ensures:
Through disciplined service delivery and unwavering commitment to security excellence, APM Infratech continues to support PGCIL in maintaining safe, compliant, and reliable operational environments.